loading

Optimizing Fleet Utilization

Nellie Holt on August 1, 2019
blog

Data Analytics Optimizes Transportation Equipment Utilization

A global mining company with more than a dozen mines on three continents faced financial hurdles caused by the delays in transporting ore, among other inefficiencies. The massive transportation equipment used by this company and the complex operations involved in the process were difficult to track in real time. To avoid further interruptions and to reduce the financial loss caused by the delay, the company asked Onnexa for help.

Our Approach

Onnexa established a Center of Excellence to collaborate with the client’s management team to design and deliver a solution that would gather sensor data on its global installed base of mobile equipment, monitor that equipment’s performance and apply algorithmic analysis to improve the efficiency of its use. Our machine learning solution provides a dashboard for real-time monitoring and benchmarking at various stages of the transportation cycle. The solution captures data on equipment location, movement, load, use, speed and efficiency to ensure optimal use of equipment.

Our cloud-based AI analytics solution also helped mine operators to monitor the throughput and efficiency by viewing the root cause of lower yields on a near real time basis. The project, completed in seven months, included a pilot at three different sites with an initiative to extend the solution globally in its second phase.

Key successes

  • Increased annual throughput by 8% at the pilot site
  • Reduced annual capital cost by $30 million
  • Saved manual equipment management time by 24 hours per site per week

Cloud-Based Data Analytics Solution for Increased Efficiency and Capital Cost Savings

Our artificial intelligence solution eliminated the need for manual assignment matching at each of the company’s 15 mines—where one person had to spend three days per site to make a report—saving 24 hours weekly of manual equipment management time at each site. The strategy also helped the company to direct trucks based on necessity and thus reduce downtime. These efforts resulted in 8% increase in annual tonnage moved and in a total capital cost reduction of $30 million annually.